Electric car charging points

Electric car charging points in Alicante

We install your electric car charging point wherever you need it (the garage of a detached house, a space in a community car park, a company fleet or a car park) and integrate it with your solar installation so you can charge your car with your own energy during the sunny hours. We are authorised electrical installers, so the charger comes with its electrical certificate, its own protection devices and, where needed, dynamic load balancing so your trip switch doesn’t go off. We also handle the grants available for the charging point.

Authorised installer

Our own team, no subcontractors

250+ installations

In the province of Alicante

Customers who rate us on Google
Verified reviews from real customers

Fixed price

A quote with no surprises or extras

What the charging point installation includes

Electric car charging point installed at a home in Alicante

Solutions

Chargers adapted to your vehicle and your parking space

Every installation is sized using real data, never generic estimates.

Detached house

Direct connection from the consumer unit with protection and dynamic load management.

Community garage

Shared pre-installation and individual point with its own meter.

Fleets and businesses

Multiple points with power sharing and user control.

How we work

How we install your charging point, step by step

How we work

01

Site survey

Distance to the consumer unit, available power and type of vehicle.

02

Proposal

Equipment, cable routing and protection devices at a fixed price.

03

Installation

Fitting, wiring and configuration of the charger.

04

Documentation

Electrical certificate and notification to the community where applicable.

Guide prices

How much does it cost to install a charging point in Alicante

Real price ranges from projects completed in the province. The final quote is agreed after the free assessment, with no surprises or open-ended items.

Solution

Guide price

7.4 kW single-phase home charger

Installation with dedicated protection devices and up to 15 m of cabling.

€900–€1,400

11–22 kW three-phase charger

For businesses or homes with a three-phase supply.

€1,400–€2,100

Charging point in a community garage

Includes an individual meter and notification to the community.

€1,100–€1,900

Dynamic load management

Prevents power cuts while charging without increasing your contracted power.

from €220

Real reviews

Reviews from customers with a charger installed

Coverage

Where we install charging points in the province of Alicante

Our own team based in Gran Alacant, Santa Pola, with no travel charge anywhere in the province. We install charging points in homes, homeowners’ associations, fleets and car parks throughout the area.
Alicante citySan Juan de AlicanteElcheSanta PolaEl CampelloMutxamelSan Vicente del RaspeigAlcoyBenidormVillajoyosaTorreviejaDéniaXàbia (Jávea)AlteaPetrerNovelda

Frequently asked questions

Common questions about electric car chargers

You don’t need approval; it is enough to notify the president or the property administrator in writing. We prepare the technical documentation usually requested.

Yes. In surplus charging mode the charger adjusts its power to the spare energy from your panels, avoiding drawing from the grid.

There are regional calls and municipal rebates. We let you know and submit the paperwork when the application period is open.

A typical home installation with a 7.4 kW wallbox costs between €1,000 and €1,800, depending on the distance to the consumer unit and the protection devices needed. In a community garage, the length of the cable run is a factor.

Usually not: we install a dynamic load management system that reduces the charger’s power when the house is using electricity, preventing the main switch from tripping without having to contract more power.

At 7.4 kW, a 50 kWh battery charges from empty in about 7 hours; at 11 kW three-phase, in just under 5. For normal daily use, 1–2 hours of overnight charging is enough.

It depends on your supply and on the vehicle’s on-board charger. With a single-phase supply, 7.4 kW is the maximum and is usually enough for a home; three-phase is worthwhile for businesses, fleets or cars that accept 11–22 kW.

Yes. We design installations with dynamic power sharing between points, user identification and consumption logging so costs can be passed on.

Shall we install your charging point?

We will send you an assessment with estimated production, monthly savings and a fixed price. Free and with no obligation.

Keep exploring

Other services from 2B Solar

Solar panels

We design and install solar PV self-consumption systems sized to your real consumption curve. With more than 2,800 hours of sunshine a year, the province of Alicante is one of the best areas in Spain for a solar installation to pay for itself.

Batteries

A battery stores the surplus energy you produce at midday so you can use it in the afternoon and evening, when electricity is more expensive. We analyse your consumption curve and show you, with figures, whether it pays off in your case.

Electrical installations

We are an authorised electrical installation company. We carry out and certify new installations, refurbishments and extensions in homes, commercial premises and industrial units across the province.

Maintenance

Saharan dust and the salty air of the Alicante coast reduce output if the installation is not checked. We keep your panels performing at 100% and detect losses before they cost you money.

Grants and subsidies

Paperwork is what holds most families and businesses back. We take care of all of it: we identify every grant available to you in your Alicante town, prepare the documents, submit the applications and follow them up until the money is paid.

We work with the best brands

Start saving with your own energy